My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-27_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2015-05-27_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:27 PM
Creation date
6/30/2015 5:16:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
REVISION
Doc Date
5/27/2015
Doc Name
Request SR01
From
Pete Lien & Sons
To
DRMS
Type & Sequence
SR1
Email Name
MAC
WHE
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY EQUIPMENT COST <br />Equipment Description Shift Basis: 1 Per Day <br />Truck Loader Team - Truck: <br />_.,.- CAT 770D <br />Truck Loader Team - Loader: <br />CAT 992K <br />Support Equipment - Load Area: <br />NA <br />Support Equipment - Dump Area: <br />CAT DST- RSU <br />Road Maintenance - Motor Grader: <br />NA <br />Road Maintenance - Water Truck: <br />Water Tanker, 3,500 Gal. <br />Roberts Cost Breakdown: <br />Truck/Loader Team <br />Truck Loader <br />Support Equipment <br />Load Area Dump Area <br />Maintenance Equipment <br />Motor Grader Water Truck <br />%Utilization -Machine: <br />100 100 <br />NA 100 <br />NA <br />25 <br />Ownership Cost/Hour: <br />$48.57 $174.83 <br />NA $62.67 <br />NA <br />$10.57 <br />Operating Cost/Hour: <br />$88.68 $209.70 <br />NA $107.59 <br />NA <br />_ $9.05 <br />Ripper Op. Cost/Hour. <br />NA $O.OD <br />NA $0.00 <br />NA <br />$0.00 <br />Operator Cost/Hour: <br />$31.22 $39.39 <br />NA $38.85 <br />NA <br />$0.00 <br />unit Subtotals: <br />$168.46 $423.91 <br />NA $209.11 <br />NA <br />$19.63 <br />Number of Units: <br />6 1 <br />0 1 <br />0 <br />1 <br />Group Subtotals: <br />Work: $1434.67 <br />Support: $209.11 <br />Maintenance: $19.63 <br />Roberts Total Work Team Cost/Hour: $1,663.41 <br />ROBERTS MATERIAL QUANTITIES <br />Backfill Initial Volume: <br />106641 CCY <br />Swell Factor. <br />1 <br />Loose Volume: <br />106641 LCY <br />Source of Estimated Volume: <br />DRMS/GIS <br />Source of Estimated Swell Factor: <br />CAT Handbook <br />Material Purchase Cost: <br />Total Cost: <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material Weight: 2,500 Pounds/LCY <br />Description: Sandstone <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 32.16 LCY <br />Truck Beck (volume) Basis: <br />Struck Volume: <br />21.600 LCY <br />Heaped Volume: <br />31.700 LCY <br />Average Volume: <br />26.650 LCY <br />Adjusted Volume: <br />31.700 LCY <br />Final Truck Volume Based on Number of Loader <br />Passes: <br />32.000 LCY <br />loading Tool Capacity: <br />Rated Capacity: <br />16.000 <br />LCY (heaped) <br />Rock - Well <br />Bucket Fill Factor: <br />1.000 <br />Blasted (95%- <br />105%) 1.000 <br />Adjusted Capacity: <br />16.000 <br />LCY <br />Job Condition Corrections Site Altitude (ft.): 6100 feet <br />Truck Loader source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: 0.8301 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 2 Passes <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders - Material Description: NA <br />Cycle Time Elements (min): Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, clump, maneuver): 0.625 Minutes <br />Roberts Quarry; DRMS File No. M-1977-301 Surety Reduction Request <br />
The URL can be used to link to this page
Your browser does not support the video tag.