Laserfiche WebLink
HOURLY EQUIPMENT COST <br />Equipment Description Shift Basis: 1 Per Day <br />Scraper: <br />CAT 623G <br />Dozer: <br />NA <br />Support Equipment - Load Area: <br />NA <br />Support Equipment - Dump Area: <br />CAT DST - SSU <br />Road Maintenance - Motor Grader: <br />NA <br />Road Maintenance - Water Truck: <br />Water Tanker, 3,500 Gal. <br />Roberts Cost Breakdown: <br />Scraper <br />Scraper Work Team <br />Dozer <br />Support Equipment <br />Load Area Dump Area <br />Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />%Utilization -Machine: <br />100 <br />NA <br />NA 100 <br />NA <br />25 <br />Ow -ship Cost/Hour: <br />$75.81 <br />NA <br />NA $62.67 <br />NA <br />$10.57 <br />Operating Cost/Hour: <br />$140.00 <br />NA <br />NA $107.59 <br />NA <br />$9.05 <br />Ripper Op. Cost/Hour: <br />NA <br />NA <br />NA $0.00 <br />NA <br />$0.00 <br />Operator Cost/Hour: <br />$39.02 <br />NA <br />NA $38.85 <br />NA <br />$0.00 <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA $209.11 <br />NA <br />$19.63 <br />Number of Units: <br />4 <br />O0 <br />1 <br />0 <br />1 <br />Group Subtotals: <br />Work: $1019.32 <br />Support: $209.11 <br />Maintenance: $19.63 <br />Roberts Total Work Team Cost/Hour. I$1,248.06 <br />j108ERT5 MATERIAL QUANTITIES <br />Topsoil Initial Volume: <br />39900.5 CCY <br />Swell Factor: <br />1 <br />Loose Volume: <br />39900.5 LCY <br />Source of Estimated Volume: <br />DRMS/GIS <br />Source of Estimated Swell Factor: <br />CAT Handbook erlh;d <br />Material Purchase Cost: <br />Total Cost: <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Material Weight <br />2,400 Pounds/LCY (COE Handbook) <br />Description: <br />Sand/Soil -Dry, loose <br />Rated Payload: <br />55,2221 Pounds <br />Payload Capacity: <br />23 LCY <br />nn"A Wnhimnt flack: <br />Struck Voiume: <br />18 LCY <br />Heaped Volume: <br />23 LCY <br />Avera a VOlursse <br />20.5 LCY <br />Adjusted Capadty. <br />2045 LCY <br />Cycle Time: <br />Source <br />Scraper loading Time(min.): 0.9 CAT HB <br />Maneuver and Spread lime (min.): 0.71 CAT HB <br />Job Condition Corrections: <br />Scraper Push Dozer Source <br />Altitude Adj.: 1 NA CATHS <br />lob EHiclency: 0.83 NA CAT HB <br />Net Correction: 0,83 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained <br />Adjusted for lob Conditions: <br />300.14 LCY/Hour <br />Total lob Time: <br />Selected Number of Scrapers: <br />4 Scraper(s) <br />$1.04 /LCY <br />Adjusted Single Scraper Team (unit) Hourly production: <br />1200.559146 LCY Hour <br />Adjusted Multiple Scraper Team (fleet) Hourly Production: <br />1200.559146 LCY/Hour <br />Unadjusted Unit Production/Hour: <br />361.61 LCY/Hour <br />Optimal Number of Scrapers Per Push Dozer: NA <br />Scraper(s) <br />Fleet Size: <br />1Teams) <br />Total lob Time: <br />33.23 Hours <br />Unit Cost: <br />$1.04 /LCY <br />Total lob Cost: <br />$41,479.19 Dollars <br />Roberts Quarry; DRMS File No. M-1977-301 Surety Reduction Request <br />