Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. I. <br />ANGLOGOLD ASHANTI (COLORADO) amec l <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />ECA representatives prior to geomembrane deployment. Approximately 8,466 linear feet of seam <br />was fusion welded during deployment using one or two fusion welding machines for each day of <br />deployment. Approximately 620 linear feet of seam was extrusion welded during deployment <br />using one welding machine for each day of deployment. Destructive and non-destructive testing <br />was completed per technical specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted per project specifications. <br />No panels (80mil LLDPE) were accepted by AMEC, Ames and ECA representatives during this <br />reporting period. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />