Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORARO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />CQA ACTIVITIES: <br />1) Field Activities: <br />amec <br />foster <br />wheeler <br />The following activities were observed: Placement and compaction of th� Phase 1 & 2 Structural Fill <br />materials, placement, compaction, density testing and depth verification of Soil Liner Fill materials, pump <br />monitoring at the LVSCS riser pipes, tertiary underdrain construction, s0grade acceptance, soil liner fill <br />acceptance, geomembrane installation and remediation of underground orkings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: Cameron -Soil Liner Fill; SLF-182-C <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held June 3, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None, <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />i <br />Bobby Redd, El <br />Project Resident <br />Reviewed by: <br />CC&V Projects <br />Reviewed By: <br />Date: June 11, 2015 <br />Date: <br />Date: (o It .5 <br />Reviewed By: I Date: <br />