Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />None. <br />Soil Liner Fill: <br />Cat haul trucks transported SLF from the Cameron stockpile to the Phase 1 stockpile. Cat dozers <br />placed SLF above DD Bench. <br />Drain Cover Fill: <br />None. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No activity. <br />Tertiary Underdrain: Construction of several tertiary underdrains continued between <br />stations A14+00 and A18+00. Activity was in accordance with <br />project plans and specifications. <br />Leak Detection: <br />No activity. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />B) Underground Workings: <br />UG #6050: Confirmatory drilling: 65 boreholes, 3,250 LF. Further remediation required. <br />UG #6004: An excavator continued chasing an adit into the slope. Further remediation required. <br />Anaconda Mine Complex: Step 3: Completed second layer of geogrid placement. Completed <br />placement and compaction of the Select Structural Fill material.. Began third layer of geogrid <br />placement. Further remediation required. <br />UG #6588: Cat dozers continued preparation of geogrid subgrade. Further remediation required. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />