My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-06-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:32 PM
Creation date
6/8/2015 10:16:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/8/2015
Doc Name
QA Report
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />None. <br />Soil Liner Fill: <br />Cat haul trucks transported SLF from the Cameron stockpile to the Phase 1 stockpile. Cat dozers <br />placed SLF above DD Bench. <br />Drain Cover Fill: <br />None. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No activity. <br />Tertiary Underdrain: Construction of several tertiary underdrains continued between <br />stations A14+00 and A18+00. Activity was in accordance with <br />project plans and specifications. <br />Leak Detection: <br />No activity. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />B) Underground Workings: <br />UG #6050: Confirmatory drilling: 65 boreholes, 3,250 LF. Further remediation required. <br />UG #6004: An excavator continued chasing an adit into the slope. Further remediation required. <br />Anaconda Mine Complex: Step 3: Completed second layer of geogrid placement. Completed <br />placement and compaction of the Select Structural Fill material.. Began third layer of geogrid <br />placement. Further remediation required. <br />UG #6588: Cat dozers continued preparation of geogrid subgrade. Further remediation required. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.