CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: May 23, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 5.17.2015 through 5.23.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 34°F to 59°F Cloud Cover: Clear to cloudy <br />Lows: 28°F to 32°F Precipitation: Rain/Snow <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat dozer placed Structural Fill in the vicinity of UG #6004 and UG #6639. A Cat smooth drum <br />roller compacted the fill area. <br />Cat dozers continued finish grading the slope beneath the ball mill and above C Bench and FF <br />Bench. A Cat smooth drum roller compacted the subgrade. <br />Cat haul trucks delivered mine waste material to the surge area for use as Structural Fill. Cat <br />dozers placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum <br />roller compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />W <br />W <br />D <br />D <br />D <br />W <br />D=Day Shift N=Night <br />Shift <br />W= <br />Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 34°F to 59°F Cloud Cover: Clear to cloudy <br />Lows: 28°F to 32°F Precipitation: Rain/Snow <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat dozer placed Structural Fill in the vicinity of UG #6004 and UG #6639. A Cat smooth drum <br />roller compacted the fill area. <br />Cat dozers continued finish grading the slope beneath the ball mill and above C Bench and FF <br />Bench. A Cat smooth drum roller compacted the subgrade. <br />Cat haul trucks delivered mine waste material to the surge area for use as Structural Fill. Cat <br />dozers placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum <br />roller compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />