My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-06-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:32 PM
Creation date
6/8/2015 10:16:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/8/2015
Doc Name
QA Report
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br />materials, pump monitoring at the LVSCS riser pipes, tertiary underdrain construction, subgrade <br />acceptance, and remediation of underground workings. <br />11) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, and sieve analysis testing continued. <br />The following samples were collected: Phase 1 - Soil Liner Fill; 1-SLF-7-R <br />Phase 1 - Soil Liner Fill; 1-SLF-8-R <br />Cameron - Soil Liner Fill; SLF-180-C <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held May 20, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />1 Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: Tensar UX1800 Geogrid — 104 rolls. <br />CQA Monitor <br />Submitted by: Date: May 26, 2015 <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: Date: <br />CC&V Projects / ' <br />Reviewed By: Date: .5130 %15 <br />Reviewed By. j ) Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.