My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-21_PERMIT FILE - C2010089A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2015-05-21_PERMIT FILE - C2010089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 8:48:10 AM
Creation date
6/4/2015 9:49:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2015
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 151 <br />BULLDOZER WORK <br />Task description: Regrade Trailing Spoil Ridges <br />Permit Action: 2014 Midterm Review <br />Site: New Horizon North Mine (MT -I) Permit/Job#: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 12/12/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IR - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation <br />Filename <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,750,000 <br />Swell factor: 1.000 <br />Loose volume: 2,750,000 LCY <br />Source of estimated volume: Map 2.05.2-1; Section 2.05.4(2)(c) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />300 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-25% <br />5,000 feet <br />2,550 lbs/LCY <br />Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG.) <br />Material consistency: 1.100 (CAT HB) <br />None <br />C089-003 <br />CIRCES Cost Estimating Software <br />I Utilization % <br />Ownership Cost/Hour: <br />$173.50 <br />NA <br />Operating Cost/Hour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,750,000 <br />Swell factor: 1.000 <br />Loose volume: 2,750,000 LCY <br />Source of estimated volume: Map 2.05.2-1; Section 2.05.4(2)(c) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />300 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-25% <br />5,000 feet <br />2,550 lbs/LCY <br />Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG.) <br />Material consistency: 1.100 (CAT HB) <br />None <br />C089-003 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.