My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-21_PERMIT FILE - C2010089A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2015-05-21_PERMIT FILE - C2010089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 8:48:10 AM
Creation date
6/4/2015 9:49:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2015
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 151 <br />14mil Rnute- <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />min <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />2409 <br />2.512 <br />Haul Time: 2.512 minutes <br />Rehirn Rnnte- <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />min <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />3503 <br />1.699 <br />Return Time: <br />Total Truck Cycle Time: <br />1.699 <br />8.491 <br />minutes <br />minutes <br />Loading Tool unit <br />Production <br />1,363.64 LCY/Hour Adjusted for job efficiency: <br />1,131.82 LCY/Hour <br />Truck Unit Production <br />494.64 LCY/Hour Adjusted for job efficiency: <br />410.55 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,131.82 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.890 /LCY <br />Total job time: 795.18 Hours <br />Total job cost: $1,700,740 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.