Laserfiche WebLink
Dozing method: <br />1.100 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.516 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 1.0300 <br />Adjusted unit production: 1,087.27 LCY/hr <br />Adjusted fleet production: 2174.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.479/LCY <br />Total job time: 1,264.64 Hours <br />Total job cost: $1,315,945 <br />(50% SL) <br />(AVG. <br />SHIFT/DA <br />(DOZ-OC) <br />T HB) <br />T HB) <br />T HB) <br />A <br />Page 11 of 151 <br />CIRCES Cost Estimating Software <br />