CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />The site was backfilled per project specifications. Remediated. <br />UG #6050: Timbered shaft. Excavated approximately 20 feet. No bottom found. Drill access <br />provided. Confirmatory drilling: 35 boreholes, 1,750 LF. Further remediation required. <br />UG #6531: Confirmatory drilling: 29 boreholes, 1,450 LF. Further remediation required. <br />UG #6004: Step 1: An excavator removed shot rock in preparation for geogrid subgrade. <br />Completed three layers of geogrid placement. Completed placement and compaction of the <br />Select Structural Fill material. Step 1 complete. Further remediation required. <br />Anaconda Mine Complex: Step 2: Completed third layer of geogrid placement. Completed <br />placement and compaction of the Select Structural Fill material. Step 2 complete. Further <br />remediation required. <br />UG #6588: Blasted for preparation of geogrid subgrade. Cat dozers began removal of shot rock. <br />Further remediation required. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />