Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec "I <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Phase 1 and Phase 2 slope gratterial <br />g, placement and compaction <br />of the Phase 1 and Phase 2 Structural Fill materials, placement of SLF on Phase 1 slopes, pump <br />monitoring at the LVSCS riser pipes, tertiary underdrain construction, rip rap placement, subgrade <br />acceptance, and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, and sieve analysis testing continued. <br />The following samples were collected: Select Structural Fill, SSF-18-R. <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held May 13, 2015 (Amec Foster Wheeler, CC&V, Ames) <br />➢ Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC& Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None <br />CQA Monitor �� f <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />CC&V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: May 20, 2015 <br />Date: <br />Date: S"- Z / - /5 <br />Date: S- <br />