My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-26_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2015-05-26_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:40 PM
Creation date
5/27/2015 8:33:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
5/26/2015
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources
Inspection Date
5/20/2015
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 20, 2015 C-1996-083/Bowie No. 2 Mine JDM <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />Gob Pile #I <br />Gob Pile #1 has been inactive. Technical Revision No. 97 is currently under review to provide a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile Al where the slope was identified as being greater than 2:1 <br />Gob Pile 92 <br />Gob Pile 42 was wet due to recent precipitation events. A large portion of the Gob was wind -rowed on bench #5 <br />at the time of the inspection. A portion of the Gob on bench 94 was in the process of being turned over to aid in <br />drying on the west side of bench #4 with wind -rowed Gob on the east side of bench #4. <br />During the inspection equipment was active on both Bench #5 and Bench 94. <br />Gob Pile 92 Bench 45 <br />Gob Pile #2 West End of Bench 44 <br />Lateral ditches D -F10, D -F11, and D -F6 were in good condition with problems noted. <br />Gob Pile 93 <br />Material was being placed on the west side of the gob pile at the time of the inspection. The material placed on the <br />west side was very wet with access to the east side of the pile limited. The majority of the pile was inspected from <br />the facilities area above Gob Pile #3. <br />The under drain was discharging at the time of the inspection with a trickle discharge. No problems were noted. <br />Number of Partial Inspection this Fiscal Year: 13 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.