CRIPPLE CREEK & VICTOR GOLD MINING Co. • <br />1,14 <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />One Cat 345 excavator removed excess SLF from the Phase 1 A bench in the vicinity of station <br />A7+00. The material was placed upslope on approved subgrade for sebsequent grading. <br />One Cat 312 excavator finish graded the south Phase 1 containment berm between stations <br />A0+00 to C0+00. <br />One excavator with attached vibratory tamper plate compacted the Phase 1 containment berm <br />between stations A0+00 and C0+00. Laborers, with a fire hose connected to a water truck, <br />maintained surface moisture. <br />One hand operated vibratory plate compactor compacted the Soil Liner Fill material along the <br />Phase 1 A bench next to the existing PSSA liner between approximately stations A8+00 through <br />A10+00. <br />One Cat 312E excavator trimmed the previously placed Phase SLF from along the edge of the A <br />and C benches in the vicinity of stations A4+00 through A6+00 and C0+00 and C3+00. <br />The above activities were performed per the project plans and specifications <br />Drain Cover Fill: <br />Continued the haul and placement of Drain Cover Fill (DCF) material between the Phase 1 B and <br />DD benches upslope of approximately stations 134+00 through B13+00. GPS equipped Cat D6 <br />LGP dozers were used to spread the material, pushing uphill while maintaining a minimum of two <br />feet of cover between the LLDPE liner and the dozer tracks. The Cat 740 rubber tired haul trucks <br />maintained a minimum cover depth of four feet above the geomembrane liner. <br />Prior to DCF placement, high volume solution collection piping was placed on the approved <br />LLDPE liner per the project drawings. <br />Ames and Amec personnel were on site throughout the shift to monitor the integrity of the liner <br />and piping during DCF placement. <br />The above DCF activities were performed per the project plans and specifications. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No activity <br />Tertiary Underdrain: No activity <br />Leak Detection: <br />Completed the installation of the leak detection system outside the Phase 1 boundary between <br />the Phase 1 containment berm and the leak detection manhole — excavated pipe trench, <br />welded/installed solid HDPE piping, and installed the leak detection manhole. Completed backfill <br />of the HDPE pipe and the pipe connection to the manhole. <br />The above activities were performed per the project plans and specifications. <br />