My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-30_REVISION - M2006085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006085
>
2015-04-30_REVISION - M2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 4:51:57 PM
Creation date
5/1/2015 4:17:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006085
IBM Index Class Name
REVISION
Doc Date
4/30/2015
Doc Name
Application AM01
From
Leone Sand and Gravel, LLC
To
DRMS
Email Name
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E <br />Unless spec <br />described and ap <br />Technical Revisi <br />ing text explain <br />in this Amendmen <br />CHANGE IN RESOILII <br />In the curr <br />topsoiling requi <br />reclaimed. This <br />in was found tha <br />are greater, so <br />topsoil /growth m <br />use will remain <br />The reclama <br />proved in the or <br />contain a good v <br />vegetation in th <br />livestock on a s <br />reclamation and <br />CHANGES TO TIME l <br />(Since this <br />mining and recla <br />the Division whe <br />operator will ke <br />gresses in the a <br />lines in the Rul <br />follow closely w <br />there is adequat <br />graded, shaped, <br />remedial reclama <br />done until the v <br />standards. <br />RETAINING ACCESS <br />The existin <br />area is reclaime <br />parcel for acces <br />amendment area w <br />road. On the am <br />left for landown <br />RECLAMATION PLAN <br />fically discussed below, the reclamation methods <br />roved in the original 2006 permit and any <br />ns approved, will remain unchanged. The follow - <br />the changes to the Reclamation Plan as proposed <br />G DEPTH I <br />ntly approved reclamation plan the Howell parcel <br />•ement is to placed -6 inches over the area to be <br />is correct for that parcel. On the Biber parcel <br />the salvageable topsoil /growth medium depths <br />,n the amendment area we plan to replace the <br />dium at a rate ofi6 to 9 inches. The final end <br />•angeland. ' <br />ion topsoiling plan and grasses seed mix ap- <br />ginal plan will remain the same. The seedmix <br />.riety of grasses that will result in sustainable <br />seeded areas. There will not be grazing of <br />} <br />eded area until the Division approves the <br />•eleases the area for grazing. <br />MIT AND PHASED RECLAMATION <br />amendment removed the phasing steps in the <br />Cation plans the original commitment to notify <br />Reclamation begin's in a phase.) Instead, the <br />p the Division apprised of reclamation pro - <br />.nual report and follow the reclamation guide - <br />s and Regulations! In short, Reclamation will <br />th mining. When mining ends on an area and <br />area to start reclamation that area will be <br />4 <br />�esoiled and seeded within the first year. If <br />ion is needed over the next 5 years it will be <br />getation has beenlestablished to the required <br />i <br />TOADS <br />landowner access'roads will be retained when an <br />We also need to keep roads open on the Howell <br />to the gas lines and the haul route from the <br />11 cross this parcel utilizing the existing haul <br />ndment area the haul road will be graded and <br />r access. <br />i <br />E: <br />
The URL can be used to link to this page
Your browser does not support the video tag.