Laserfiche WebLink
MINING PLAN <br />EXHIBIT D (CONT) <br />deposit and east or south, out the fingers as they are reached. <br />This is shown on the Mining Plan Map. <br />MINING TIMETABLE <br />The continuing uncertainty of'economic conditions in the <br />construction materials industry precludes an accurate forecast of <br />demand for materials during the life of the mine. We therefore, <br />can only estimate the mining timetable based on an average year <br />and may expect a specific year to vary widely from the average. <br />f <br />Table D -1 MINING TIMETABLE <br />* Approximately 36.80 acres remains to be mined. <br />7 <br />Acres ± „ <br />Total <br />Mined <br />Buffers and <br />Years <br />Area <br />Area <br />Setbacks <br />Howell <br />Prop- <br />` <br />erty (current <br />permit area) <br />1 -2 <br />180.0 <br />115.90* <br />64.10 <br />Biber Prop- <br />1 <br />1 22 -25 <br />327.50 <br />203.60 <br />120.70 <br />Totals <br />1 <br />1 507.50 <br />1 319.50 <br />1 184.80 <br />* Approximately 36.80 acres remains to be mined. <br />7 <br />