Laserfiche WebLink
RECLAMATION PLAN <br />0 <br />EXHIBIT E (cONT) <br />UPDATED RECLAMATION PLAN MAP <br />The Reclamation Plan map was revised and updated to added <br />the amendment area. Figure E -1 isia color version of the larger <br />map that shows the areas to be revegetated. <br />TOPSOIL STORAGE REVISIONS I <br />The topsoil Ipiles will be seeded with 3 # per 100 square <br />feet of Western Wheat grass if they remain undisturbed for more <br />then one growing I season. They will be located around the area to <br />be mined to reduce the haul distance or if possible it will be <br />replaced on graded areas as it is stripped from an area to be <br />mined. l ►, <br />RECLAMATION TIMETABLE <br />The numbers I presented below represent our estimate of the <br />various area of disturbance in the'mine area. They may change as <br />the actual mining progresses through the site. <br />Table E- 1: Reclamation Phases <br />Area <br />Years <br />ACRES <br />TOTAL <br />REVEGE- <br />TATION <br />Road <br />BUFFER <br />Howell Parcell <br />3 -5 <br />180.00 <br />115.05 <br />0.85 <br />64.10 <br />Biber Parcel <br />l <br />3 -5 <br />327.50 <br />203.60 <br />3.20 <br />120.70 <br />Totals <br />1 507.50, <br />301.10 <br />4.05 <br />1 184.80 <br />i <br />9 <br />