My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-04-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:26 PM
Creation date
4/21/2015 8:49:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/20/2015
Doc Name
Weekly CQA Report Weeks Ending 4/4/15 & 4/11/15
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. S� <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />UG #6631 - Placed and compacted Structural Fill material over the working. Remediated. <br />UG #6639 — One Sandvik 800 track drill drilled approximately 1,1001-17. Installed the first layer of <br />geogrid. Placed and compacted the first layer of select structural fill material over the geogrid. <br />Further remediation required. <br />UG #6653 — Excavated approximately 25' to native ground and backfilled. Remediated. <br />UG #6660 — 4 cubic yard concrete plug poured. Further remediation required. <br />UG #6668 — Previously excavated to competent rock; backfilled and compacted per the projec: <br />specifications. Remediated <br />UG #6675 — Excavated to approximately 30' depth to competent rock and then backfilled. <br />Remediated. <br />UG #6676 — Excavated to approximately 30'. Excavation to be continued. Further remediation <br />required. <br />UG # 6677 — Excavated approximately 30' to competent rock. Remains to be backfilled. Further <br />remediation required. <br />Anaconda Mine complex: Prepared workings for geogrid placement. <br />All of the above remediation activities were performed per the project plans and specifications. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />CQA ACTIVITIES: <br />1) Field Activities: <br />Field activities and observation during this reporting period included: Slope grading, structural fill <br />placement, underground working remediation, pumping of the LVSCS riser pipes, ADR2 waterline <br />installation. <br />11) Laboratory Activities: <br />Atterberg limits, moisture, laboratory compaction, and sieve analysis laboratory testing continued <br />from the previous reporting periods sampling. No additional QA or QC samples were obtained for <br />laboratory index testing during this period. <br />General Proiect Items <br />Meetings and Discussions: <br />D The Weekly Contractor Meeting was held April 1, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />�- Ames daily safety meetings <br />> Amec Foster Wheeler daily safety meetings <br />
The URL can be used to link to this page
Your browser does not support the video tag.