Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. ,. <br />ANGLOGOLD ASHANTI (COLORADO) amec,� <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Deliveries: Received and inventoried 120 rolls of 80 mil double sided textured LLDPE liner. The liner <br />was staged on a prepared surface in the PSSA footprint. The rolls were stacked a maximum of three rolls <br />high as specified. <br />Submitted by: Mike Moore �- Date: April 7, 2015 <br />Reviewed by:`td /� t rt?, xGr�� /.�Z Date: <br />CC&V Projects <br />Reviewed By: �/ Date: <br />Reviewed By: Date: if _ <br />