Laserfiche WebLink
on <br />on <br />• 2' thick slab at supports, 1' thick elsewhere (see TH drawings in Appendix <br />17) all with reinforcing bars <br />• Steel beam supports on footers as shown on TH drawings <br />• Containment walls are 4 feet high around foundation and 6" thick <br />Various piping and pumps to be removed. <br />Overhead Bridge with supports and slurry pipes.and electric cable <br />Battery Charging Building <br />o 45' wide x 120' long x 24' tall "at peak" <br />• Micropyle, Footer and Slab Foundation "dimensions TBD" <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant, Forced Air and Baseboard heating <br />o Spray Foam Insulation <br />Shaft Superstructure Installation (One Definite at Governor Basin) and Possibly Two others <br />at the two permitted shaft locations. <br />• 12' wide x 12' long x 1' tall concrete foundation reinforced with W rebar <br />• Steel I -beam headframe structure, 26 feet hig x 12' x 12' footprint which must be <br />dismantled and removed <br />• RCM50 Rustable metal siding and roofing on the headframe structure <br />• Hoist house made from 2 sea cans of 8' width x 20' length each, sitting on 6" <br />concrete slab foundation of 16'x 20' dimensi I s, with Electric motor, small diesel <br />generator, switchbox, hoist wheel and wire rope. The sea cans will be removed by <br />flatbed truck upon reclamation. The foundation will be broken up and put into the <br />shaft prior to shaft sealing. <br />Revenue Mine March 2015 L -6 <br />