Laserfiche WebLink
o Refuge chamber made from 2 sea cans of 8'x40' ' length with bunks and survival <br />supplies. These sea cans will be placed directly on flat compacted ground with no <br />foundation. The sea cans will be removed by flatbed truck upon reclamation. <br />Fortune Revenue asks that the two future locations only be bonded for the removal of structures <br />at those locations if the plans become definite to install structures there. It may be possible that <br />the sites are only used for airflow and will have no structures. It is understood that a Technical <br />Revision would need to be submitted if those structures will b, installed. <br />The Filter Building is the location where the tailings are dewat i red prior to exiting the building for <br />permanent disposal in the tailings /waste rock piles. The waterIis recycled in the mill. Large filter <br />presses will be installed in this building and will be removed for reclamation. The filters and <br />associated piping will need to be removed for reclamation. This cost is included. <br />The Switch Gear Building houses the transformers and switch gear that provide the proper voltage <br />for all the electrical uses on site. Since the dry building, battery building and filter building will <br />remain and will need heat and lights, the switch gear building should remain to provide this power <br />from the electric pole on site. <br />The battery charger building is the structure that doubles as ai snow shed to protect the portal <br />from getting snowed in. This should remain to allow bat access. It will be very solid and also <br />reflects the history of the site. <br />There are 4 - 2500 gallon plastic potable water tanks near the main mine portal as shown on all <br />mine maps. These tanks will be removed by pickup truck at mine closure. <br />The storage portals have installed metal gates which prevent entry and the landowner desires that <br />these gates remain to allow future use of the underground storage which is protected from the <br />weather. For this reason, no sealing cost for these portals is included. The main mine portal <br />Revenue Mine March 2015 L -7 <br />