Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 056 Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />8.00 <br />LCY <br />Heaped Volume: <br />10.00 <br />LCY <br />Average Volume: <br />9.00 <br />LCY <br />Adjusted Volume: <br />10.00 <br />LCY <br />1 <br />Truck Ownership: <br />Final Truck Volume <br />Based on Number of Loader Passes: 8.36 LCY <br />Loading Tool Capaci <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />Bucket Size Class: Medium <br />2.260 LCY (heaped) <br />0.925 Loose material - 1/8" to 3/8" (90 - 95 %) 0.925 <br />2.091 <br />LCY <br />i <br />Site Altitude (ft.): 4500 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE i <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />4 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE i <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />4 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: NA <br />Factor min. <br />Source <br />Material: <br />NA <br />NA <br />Cat HB <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Ownership: <br />NA <br />NA <br />Cat HB <br />Operation: <br />NA <br />NA <br />Cat HB <br />Dump Target: <br />NA <br />NA <br />Cat HB <br />t <br />CIRCES Cost Estimating Software <br />Minutes <br />Minutes <br />Minutes <br />Net Cycle Time Adjustment: NA <br />minutes <br />Adjusted Loader Cycle Time: 0.367 <br />minutes <br />Net Load Time per Truck: 1.201 <br />i <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Minutes Adjusted for site altitude: <br />0.500 <br />Truck Load Time: 1.201 <br />Minutes Adjusted for site altitude: <br />1.201 <br />Truck Maneuver and Dump Time: 0.80 <br />Minutes Adjusted for site altitude: <br />0.800 <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling_, dirt/It. surfaced, watered, <br />maintained 3.0 <br />i <br />1 <br />i <br />t <br />CIRCES Cost Estimating Software <br />Minutes <br />Minutes <br />Minutes <br />