Laserfiche WebLink
l Pagel of 3 <br />i <br />TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile 2 to Rail Loop ' <br />Site: Fruita Loadout Permit Action: MTI 1 Permit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 056 State: <br />Date: 8/26/2014 County: <br />User: ZTT <br />Colorado <br />Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 8 -10 c , 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />('net Rraalydnwn- Trnclk/f .nndP.r Team <br />Abbreviation: None <br />Filename: C088 -056 <br />Shift basis: 1 per day <br />NA t <br />Cat D9T - 9SU <br />CAT 12M <br />Water Tanker, 5,000 Gal. <br />Rnnnnrt F.nninment <br />Maintenance Rnninment <br />Total work team cost/hour: $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 5,900 CCY Swell factor: 1.125 <br />Loose volume: 6,638 LCY <br />Source of estimated volume: Operator Estimate; Maps 9 and 16 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 e <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.29 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />100 <br />50 <br />100 <br />Ownership cost/hour: <br />$9.39 <br />$38.17 <br />NA <br />$72.57 <br />$24.98 <br />$20.53 <br />Operating cost/hour: <br />$50.50 <br />$87.89 <br />NA <br />$142.41 <br />$23.17 <br />$47.40 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.83 <br />NA <br />$38.85 <br />$38.23 <br />$25.61 <br />Unit Subtotals: <br />$59.89 <br />$164.89 <br />NA <br />$253.83 <br />$86.38 <br />$93.55 <br />Number of Units: <br />3 <br />1 <br />0 <br />1 1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $344.56 <br />Support: $253.83 <br />Maint: $179.93 <br />Total work team cost/hour: $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 5,900 CCY Swell factor: 1.125 <br />Loose volume: 6,638 LCY <br />Source of estimated volume: Operator Estimate; Maps 9 and 16 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 e <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.29 LCY <br />CIRCES Cost Estimating Software <br />