Laserfiche WebLink
i <br />1 <br />Truck/Loader Worksheet Cont'd Task # 055 Page 3 of 3 <br />t <br />Haul Rnute- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />N <br />N <br />•(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />244.81 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1200.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.529 <br />Haul Time: 0.529 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />M <br />( %) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />244.81 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1200.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.446 <br />i <br />i <br />CIRCES Cost Estimating Software <br />I <br />a <br />Return Time: 0.446 <br />minutes <br />Total Truck Cycle Time: 3.476 <br />minutes <br />Loading Tool unit <br />Production <br />294.96 <br />LCY/Hour Adjusted for job efficiency: <br />244.81 LCY/Hour <br />Truck Unit Production <br />144.34 <br />LCY/Hour Adjusted for job efficiency: <br />119.80 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 359.40 <br />LCY /Hour <br />Adjusted single truck/loader team production: 244.81 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 244.81 <br />LCY/Hour <br />' <br />JOB TIME AND COST <br />r <br />Fleet size: <br />1 <br />Team(s) Total job time: i 22.06 <br />. r <br />Hours <br />Unit cost: <br />$3.179 <br />/LCY Total job cost: $17,168 <br />i <br />i <br />CIRCES Cost Estimating Software <br />I <br />a <br />