Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Haul Route- <br />I <br />Task # 056 <br />I <br />Page 3 of 3 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />N <br />( %) <br />(fpm) <br />Time <br />Truck(s) Selected Number of Trucks: 3 <br />Adjusted hourly truck team production: 382.63 <br />min <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.422 <br />Haul Time: ' 0.422 minutes <br />Rehirn Rnnte- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />N <br />(fpm) <br />Time <br />Truck(s) Selected Number of Trucks: 3 <br />Adjusted hourly truck team production: 382.63 <br />min <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.342 <br />Return Time: 0.342 minutes <br />Total Truck Cycle Time: 3.265 minutes <br />Loading Tool unit <br />Production <br />294.96 <br />LCY/Hour Adjusted for job efficiency: 244. <br />Truck Unit Production <br />153.67 <br />LCY/Hour Adjusted for job efficiency: 127. <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: 3 <br />Adjusted hourly truck team production: 382.63 <br />Adjusted single truck/loader team production: 244.81 <br />Adjusted multiple truckiloader team production: 244.81 <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 27.11 <br />Unit cost: <br />$3.179 <br />/LCY Total job cost: $21,102 <br />r <br />t <br />I <br />i <br />i <br />81 LCY/Hour <br />54 LCY/Hour <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY /Hour <br />'Hours <br />CIRCES Cost Estimating Software <br />