(g) There is an,existing access road extending approximately 2,600 linear feet and is approximately 10- 12'feet <br />,...wide-.`The road requires minimal annual maintenance via backhoe. <br />(h) A 300 gallon water tank, will be filled with clean . water off -site and. transported and` stored on site' during <br />operations. The tank will be refilled as needed off -site. �.! !'` _ ;�• " ' -r ' = • ` ' <br />(i) Neither groundwater nor surface water are expected to be encountered under the proposed operation. <br />(k) N/A no -acid or toxic producing materials are expected during the proposed operation. <br />(1). N/A -mo water is expected: to be encountered that could have an,, effect.on,the hydrologic balance. <br />(m) N/A no processing on site. <br />(n) The primary commodity to be mined or extracted is Rhodocrosite which is used as a collectible in the <br />collectible min industry.' <br />industry <br />(o)'1Vlinimal amounts of drilling and�blasting will 'be'utilized during the advancement of drifts during mining'and <br />exploration. Any explosives needed for the proposed activities will be handled by certified blasting contractors <br />and be stored off -site until a safe underground, storage facility is created:,.' <br />(2) N/A — There will be no milling or processing of minerals on site and therefore this section of the exhibit <br />is not applicable. . <br />{. - i r =t , .{, • ! d i =!., ,; 1 1 �; s .'1.1.1 ' ,' , r 1• , - . •r:. <br />EXHIBIT D' '. <br />RECLAMATION PLAN , • ., f . . , <br />fi (1), y.. Reclamation will be conducted upon completion of•exploration and mining development activities: Due <br />to the seasonal weather,•,proposed activities will prirnarily_be conducted May through November as' would the <br />reclamation of site. All required reclamation will be completed no later than 5 years after the culmination of <br />mining and exploration. <br />Reclamation and clearing of pre- existing trash and lumber is ongoing at the site. <br />The mine and proposed operations do not require settling ponds or water discharge and minimal surface water <br />runoff,will be diverted by proper grading and reclamation, if encountered. Additional covering such as 'tarps' <br />may be utilized on any Waste Rock Impoundment if deem' <br />eemed necessary'by the USFS: However, the proposed <br />amount of waste rock after proper grading should not have any effect on surface water runoff and diversion. ,• <br />The following - outlines plans for. reclamation:'} <br />1. Backfill, reshape, and! reseed as needed all holes, pits and excavations associated with mining operations. <br />2. Stabilize disturbed sites during and after operations to control erosion and mass wasting. , <br />3. Remove all trash off of US Forest Service land's. <br />,4. Remove all structures from US ,Forest Service lands with, the, exception of the pre- existing structure <br />described in Exhibit L. <br />.+ <br />= 5. Complete all reclamation within five years of the completion of exploration and mining activities.,t E , <br />6. Break up and disperse cut banks in the access road.. , <br />7. Earth work, which includeslbackfilling, re- contouring and smoothing, will be completed with no., rough <br />piles exceeding 24 inches., <br />! r , <br />8. Divert surface run -off (if any exists) from disturbed areas. <br />9.. No. Trees will be cut,or removed in association with the proposed mining; activities'.. <br />