Laserfiche WebLink
The demolition debris from the structure would be hauled to the local landfill and all concrete <br />from slabs and footer would be removed and buried into the 3:1 and /or 4:1 side slopes as <br />called out in the Reclamation Plan (Exhibit E). The shed and generator would be hauled off <br />and utilized elsewhere. <br />See attached estimate of cost calculation sheet, drawing and photo. <br />Should you have questions, please feel free to contact me. <br />Best Regards, <br />X 4 A <br />Randy DiLuzio <br />General Manager <br />Tezak Heavy Equipment Co., Inc. <br />(D0922959.1) <br />