Laserfiche WebLink
The demolition and reclaiming costs for the Quonset Hut structure as described on the <br />attached cover letter: NOTE. These costs are calculated with the assumption that the <br />structure is demo'ed and not disassembled and sold in an attempt to reduce costs. <br />Demolition Quantities <br />Demolition Material Quantities <br />Quonset Hut Structure 20 CY <br />Concrete Footer: 16"x 16" x 211 LF 13 CY <br />Concrete Slab: 20'x 30'x 8" 14.7 CY <br />Concrete Floor: 22'x 40'x 8" 21.5 CY <br />Total Demolition Material 69.2 CY <br />Total Demolition Material @ swell factor of 1.25% 86.5 CY <br />Demolition Costs: Al equipment costs include equipment rate, operator, burden and fuel. <br />Equipment/Description Unit Unit Cost <br />Cat 320DL Excavator w/Thumb 6 hrs. $71.67 <br />Cat 950H Wheel Loader 4 hrs. $71.08 <br />KW Tractor/Trailer(2 loads off site, 3 loads onsite) 4 hrs. $84.48 <br />Local Landfill Dump Fee /Refuge Charge 25CY(20CY w /swell) $20.00 <br />Seeding (already incorporated into existing Reclamation Bond) <br />Mobilization 4 hrs. $119.81 <br />Total Demolition Costs <br />Overhead and Profit @ 18% <br />Total Cost <br />$430.02 <br />$284.32 <br />$337.92 <br />$500.00 <br />$00.00 <br />$479.24 <br />$2,031.50 <br />$365.67 <br />Total Costs $2,397.17 <br />