Laserfiche WebLink
IRIS MITIGATION AND DESIGN INC. <br />IRIS 2022 Arapahoe Street <br />MITIGATION AND DESIGN, INC. Golden, Colorado 80401 <br />Environmental Consulting Phone: 720 - 272 -1985 <br />bleisure@irismitigation.com <br />The trees and shrubs were provided by Conservation Seeding and Restoration Inc. ( "CSR ") and <br />were installed by CSR with IRIS oversight. <br />Remainder of Phase 1 Mitigation <br />The remaining Phase 1 impacted trees, shrubs and mitigation activities as detailed on Tables 1 <br />and 2 will be mitigated for following the Phase 2 valley floor clean -up activities. The Phase 2 <br />mitigation includes 0.3 acre of upland area restoration, 0.35 acre of riparian area creation and <br />restoration, and the planting of 174 riparian trees and 615 willow stakes (see Tables 1 and 2). <br />The reason for postponing the completion of all Phase 1 mitigation is that some of the area <br />along the Creek downstream of the cutoff wall will likely be impacted during Phase 2 valley floor <br />clean -up activities. Since it is unknown exactly where this impact will occur, it is prudent to <br />delay the planting of the remaining trees and shrubs until the valley floor and associated Creek <br />Irestoration work has been completed. <br />I'] <br />1 <br />Schwartzwalder Mine Phase 1 — 2014 Second Annual Mitigation Monitoring Report Page 3 <br />March 2015 <br />t <br />