My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-02_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-04-02_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:59 PM
Creation date
4/3/2015 8:46:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/2/2015
Doc Name
CQA Report - Weeks ending 3/7/15, 3/14/15, 3/21/15
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec •�` <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement, secondary underdrain installation, underground working remediation; <br />and monitoring SO placement in the PSSA_ <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 14 -1 (information only) <br />Underdrain Fill 2UF -3 -R (Record Sample) <br />y Select Structural Fill 2SSF -4 -R (Record Sample) <br />General Project Items <br />Meetings and Discussions: <br />y The Weekly Contractor Meeting was held March 4, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: Snow was removed around the south end (ADR pad area) of the 9,450 bench in <br />preparation for drain cover fill verification of grade. <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Date: March 12, 2015 <br />Reviewed by: Date: March 12. 2015 <br />Andrea Meduna M„V- E t4%Cy-J, C- i;�: nF t c%-IW — <br />Project Engineer <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Reviewed By: Date: <br />Reviewed By. Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.