Laserfiche WebLink
ATTACHMENT A <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Amec Foster Wheeler - 2015 CQA Field Staff Schedule MLE2 <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />Mar.1 <br />r. <br />Mar.2 <br />Mar.3 <br />—9 <br />Mar.5 <br />Mar.6 <br />Mar.7 <br />Tim Burkhard <br />PR <br />PR <br />Eric Lorenson <br />ST <br />ST <br />ST /PR <br />I ST /PR <br />ST /PR <br />ST /PR <br />Ben Melly <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />UG <br />UG <br />UG /PR <br />UG /PR <br />UG /PR <br />_ <br />Tyler Browning <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Rex Harrison <br />WI <br />WI <br />WI <br />WI <br />WI <br />WI <br />I Rick Buxton <br />ST <br />ST <br />ST <br />I Razi Molloy _ <br />LT <br />LT <br />LT <br />LT <br />LT <br />Andrea Meduna <br />I <br />PM <br />1. <br />LEGEND: <br />UM = Unit Manager <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />WI = Welding Inspector <br />