Laserfiche WebLink
JRT Consulting, Inc. Journey Ventures, LLC <br />' Journey Ventures Pit <br />3/192015 <br />pRecl tion Bond Quantities and Costs tpy/jcy <br />JAT Con inithm ]Inc- <br />Phase 9 (4.06 acres) <br />Reclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 3-8 <br />(7,640) <br />If <br />$ <br />310.00 <br />$ (2,368,400) <br />(2,333,680) <br />Slurry Wall Required to Close Phases 3 -9 <br />7,528 <br />If <br />$ <br />310.00 <br />$ <br />2,333,680 <br />Credit for Overburden Placement Required to Close Phase 3-8 <br />(226,370) <br />cy <br />$ <br />2.25 <br />$ <br />(509,333) <br />Overburden Placement Required to Close Phase 3 -9 <br />223,052 <br />cy <br />$ <br />2.25 <br />$ <br />501,867 <br />Scarifying Disturbed Area Phase 9 <br />0.05 <br />ac <br />$ <br />200 <br />$ <br />10 <br />Topsoil Placement Disturbed Area Phase 9 <br />0.05 <br />ac <br />$ <br />1,800 <br />$ <br />90 <br />Revegetate Disturbed Area Phase 9 <br />0.05 <br />ac <br />$ <br />1,000 <br />$ <br />50 <br />Dewatering Required for Phase 9 Area <br />245.72 <br />Mil. Gal. <br />$ <br />400.00 <br />$ <br />98,288 <br />Total Direct Cost <br />$ <br />56,251 <br />Overhead and Profit Cost (12.60 %) $ 7,088 <br />Contract Cost $ 63,339 <br />Project Management (9.25 %) $ 5,859 <br />Additional Financial Warranty Required For Phase 9 $ 69,198 <br />Cummulative Financial Warranty Required For Phases 1, 11A, 2 -9 $ 3,993,667 <br />Phase 10 (5.85 acres) <br />Reclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mininq Area <br />Credit for Slurry Wall Required to Close Phases 3 -9 <br />(7,528) <br />If <br />$ <br />310.00 <br />$ <br />(2,333,680) <br />Slurry Wall Required to Close Phases 3 -10 <br />7,501 <br />If <br />$ <br />310.00 <br />$ <br />2,325,310 <br />Credit for Overburden Placement Required to Close Phase 3 -9 <br />(223,052) <br />Cy <br />$ <br />2.25 <br />$ <br />(501,867) <br />Overburden Placement Required to Close Phase 3 -10 <br />222,252 <br />cy <br />$ <br />2.25 <br />$ <br />500,067 <br />Scarifying Disturbed Area Phase 10 <br />0.52 <br />ac <br />$ <br />200 <br />$ <br />104 <br />Topsoil Placement Disturbed Area Phase 10 <br />0.52 <br />ac <br />$ <br />1,800 <br />$ <br />936 <br />Revegetate Disturbed Area Phase 10 <br />0.52 <br />ac <br />$ <br />1,000 <br />$ <br />520 <br />Dewatering Required for Phase 10 Area <br />42.85 <br />Mil. Gal. <br />$ <br />400.00 <br />$ <br />17,140 <br />Total Direct Cost $ <br />8,530 <br />Overhead and Profit Cost (12.60 %) $ 1,075 <br />Contract Cost $ 9,605 <br />Project Management (9.25 %) $ 888 <br />Additional Financial Warranty Required ForPhasel0 $ 10,493 <br />Cummulative Financial Warranty Required For Phases 1, 11A, 2 -10 $ 4,004,160 <br />5of6 <br />