Laserfiche WebLink
T&T Consulting, Inc. Journey Ventures, LLC <br />, <br />Journey Ventures Pit <br />31192015 <br />FReclamation Bond Quantit ies and Costs tpy( onsults rt, Ifna <br />Phase 6 (3.18 <br />Credit for Slurry Wall Required to Close Phases 3-5 <br />(4,979) <br />If <br />$ <br />310.00 <br />$ (1,543,444) <br />Slurry Wall Required to Close Phases 3 -6 <br />5,628 <br />If <br />$ <br />310.00 <br />$ 1,744,627 <br />Credit for Overburden Placement Required to Close Phase 3-5 <br />(147,526) <br />cy <br />$ <br />2.25 <br />$ (331,933) <br />Overburden Placement Required to Close Phase 3 -6 <br />166,756 <br />cy <br />$ <br />2.25 <br />$ 375,200 <br />Dewatering Required for Phase 6 Area <br />81.56 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 32,624 <br />184,474 <br />cy <br />Total Direct <br />Cost <br />$ 277,074 <br />Overhead and Profit Cost (12.60 %) $ 34,911 <br />Contract Cost 311,986 <br />Project Management (9.25 %) $ 28,859 <br />Additional Financial Warranty Required For Phase 6 $ 340,845 <br />Cummulative Financial Warrant Required For Phases 1, 11A, 2 -6 $ 3,090,990 <br />Phase 7 (6.53 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 3-6 <br />(5,628) <br />If <br />$ <br />310.00 <br />$ (1,744,627) <br />Slurry Wall Required to Close Phases 3 -7 <br />6,226 <br />If <br />$ <br />310.00 <br />$ 1,929,939 <br />Credit for Overburden Placement Required to Close Phase 3 -6 <br />(166,756) <br />cy <br />$ <br />2.25 <br />$ (375,200) <br />Overburden Placement Required to Close Phase 3 -7 <br />184,474 <br />cy <br />$ <br />2.25 <br />$ 415,067 <br />Dewatering Required for Phase 7 Area <br />129.08 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 51,632 <br />Slurry Wall Required to Close Phases 3 -8 <br />7,640 <br />Total Direct Cost $ <br />276,810 <br />Overhead and Profit Cost (12.60 %) $ 34,878 <br />Contract Cost 311,689 <br />Project Management (9.25 %) $ 28,831 <br />Additional Financial Warranty Required For Phase 7 $ 340,520 <br />Cummulative Financial Warranty Required For Phases 1, 11A 2 -7 $ 3,431,510 <br />Phase 8(17.81 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining A rea <br />Credit for Backfill Required to Fill Phase 2 to 2 ft Above <br />Groundwater (Haul from Phases 1, 11A) <br />(65,000) <br />cyd <br />$ <br />2.50 <br />$ (162,500) <br />Credit for Backfill Required to Fill Phase 2 to 2 ft Above <br />Groundwater (OB from Phase 2) <br />(40,000) <br />cyd <br />$ <br />1.50 <br />$ (60,000) <br />Credit for Slurry Wall Required to Close Phases 3 -7 <br />(6,226) <br />If <br />$ <br />310.00 <br />$ (1,929,939) <br />Slurry Wall Required to Close Phases 3 -8 <br />7,640 <br />If <br />$ <br />310.00 <br />$ 2,368,400 <br />Credit for Overburden Placement Required to Close Phase 3 -7 <br />(184,474) <br />cy <br />$ <br />2.25 <br />$ (415,067) <br />Overburden Placement Required to Close Phase 3 -8 <br />226,370 <br />cy <br />$ <br />2.25 <br />$ 509,333 <br />Credit for Scarifying Disturbed Area Phase 1 <br />(3.66) <br />ac <br />$ <br />200 <br />$ (732) <br />Scarifying Disturbed Area Phase 8 <br />2.69 <br />ac <br />$ <br />200 <br />$ 538 <br />Credit for Topsoil Placement Disturbed Area Phase 1 <br />(3.66) <br />ac <br />$ <br />1,800 <br />$ (6,588) <br />Topsoil Placement Disturbed Area Phase 8 <br />2.69 <br />ac <br />$ <br />1,800 <br />$ 4,842 <br />Credit for Revegetate Disturbed Area Phase 1 <br />(3.66) <br />ac <br />$ <br />1,000 <br />$ (3,660) <br />Revegetate Disturbed Area Phase 8 <br />2.69 <br />ac <br />$ <br />1,000 <br />$ 2,690 <br />Dewatering Required for Phase 8 Area <br />233.53 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 93,412 <br />Total Direct Cost $ <br />400,730 <br />Overhead <br />and Profit <br />Cost <br />(12.60 %) <br />$ 50,492 <br />Contract Cost $ <br />451,221 <br />Project Management (9.25 %) <br />$ 41,738 <br />Additional Financial Warranty Required For Phase 8 <br />$ 492,959 <br />Cummulative Financial Warranty Required For Phases 1 11A 2 -8 <br />$ 3,924,469 <br />4of6 <br />