Laserfiche WebLink
J &T Consulting, Inc. Journey Ventures, LLC <br />' <br />Journey Ventures Pit <br />3/192015 <br />Reclamation Bond Quantities and Costs tpy/ icy <br />© 2015 ,LT Cowulthm Inc. <br />Phase 3 (6.64 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit <br />Cost <br />Cost <br />Active Mining Area <br />4,979 <br />If <br />$ <br />310.00 <br />$ 1,543,444 <br />Slurry Wall Required to Close Phase 3 <br />2,194 <br />If <br />$ <br />310.00 <br />$ 680,255 <br />Overburden Placement Required to Close Phase 3 <br />65,018 <br />cy <br />$ <br />2.25 <br />$ 146,291 <br />Scarifying Disturbed Area Phase 3 <br />0.90 <br />ac <br />$ <br />200 <br />$ 180 <br />Topsoil Placement Disturbed Area Phase 3 <br />0.90 <br />ac <br />$ <br />1,800 <br />$ 1,620 <br />Revegetate Disturbed Area Phase 3 <br />0.90 <br />ac <br />$ <br />1,000 <br />$ 900 <br />Dewatering Required for Phase 3 Area <br />57.25 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 22,900 <br />Revegetate Disturbed Area Phase 4 <br />0.53 <br />Total Direct Cost $ <br />852,146 <br />Overhead and Profit Cost (12.60 %) $ 107,370 <br />Contract Cost $ 959,516 <br />Project Management (9.25 %) $ 88,755 <br />Additional Financial Warranty Required For Phase 3 $ 1,048,272 <br />Cummulative Financial Warranty Required For Phases 1, 11A, 2 -3 $ 1,379,848 <br />Phase 4 (6.49 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit <br />Cost <br />Cost <br />Active Mining Area <br />4,979 <br />If <br />$ <br />310.00 <br />$ 1,543,444 <br />Credit for Slurry Wall Required to Close Phase 3 <br />(2,194) <br />If <br />$ <br />310.00 <br />$ (680,255) <br />Slurry Wall Required to Close Phases 3 -4 <br />3,442 <br />If <br />$ <br />310.00 <br />$ 1,067,076 <br />Credit for Overburden Placement Required to Close Phase 3 <br />(65,018) <br />cy <br />$ <br />2.25 <br />$ (146,291) <br />Overburden Placement Required to Close Phase 3 -4 <br />101,985 <br />cy <br />$ <br />2.25 <br />$ 229,467 <br />Scarifying Disturbed Area Phase 4 <br />0.53 <br />ac <br />$ <br />200 <br />$ 106 <br />Topsoil Placement Disturbed Area Phase 4 <br />0.53 <br />ac <br />$ <br />1,800 <br />$ 954 <br />Revegetate Disturbed Area Phase 4 <br />0.53 <br />ac <br />$ <br />1,000 <br />$ 530 <br />Dewatering Required for Phase 4 Area <br />72.35 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 28,940 <br />Total Direct Cost $ <br />500,526 <br />Overhead and Profit Cost (12.60 %) $ 63,066 <br />Contract Cost 563,593 <br />Project Management (9.25 %) $ 52,132 <br />Additional Financial Warranty Required For Phase 4 $ 615,725 <br />Cummulative Financial Warranty Required For Phases 1 11A 2 -4 $ 1.995,573 <br />Phase 8 (7.39 <br />Credit for Slurry Wall Required to Close Phases 3 -4 <br />(3,442) <br />If <br />$ <br />310.00 <br />$ (1,067,076) <br />Slurry Wall Required to Close Phases 3 -5 <br />4,979 <br />If <br />$ <br />310.00 <br />$ 1,543,444 <br />Credit for Overburden Placement Required to Close Phase 3-4 <br />(101,985) <br />cy <br />$ <br />2.25 <br />$ (229,467) <br />Overburden Placement Required to Close Phase 3-5 <br />147,526 <br />cy <br />$ <br />2.25 <br />$ 331,933 <br />Scarifying Disturbed Area Phase 5 <br />0.75 <br />ac <br />$ <br />200 <br />$ 150 <br />Topsoil Placement Disturbed Area Phase 5 <br />0.75 <br />ac <br />$ <br />1,800 <br />$ 1,350 <br />Revegetate Disturbed Area Phase 5 <br />0.75 <br />ac <br />$ <br />1,000 <br />$ 750 <br />Dewatering Required for Phase 5 Area <br />80.78 <br />Mil. Gal. <br />$ <br />400.00 <br />$ 32,312 <br />Total Direct Cost $ 613,396 <br />Overhead and Profit Cost (12.60 %) $ 77,288 <br />Contract Cost 690,684 <br />Project Management (9.25 %) $ 63,888 <br />Additional Financial Warranty Required For Phase 5 $ 754,573 <br />Cummulative Financial Warranty Required For Phases 1, 11A, 2 -5 $ 2,750,145 <br />3of6 <br />