Laserfiche WebLink
Journey Ventures, LLC <br />J &T Consulting, Inc. <br />Journey Ventures Pit <br />31192015 <br />FReclamation Bond Quantities and Costs tpy( <br />Consoltln& I na <br />Phase 1 (3.66 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Scarifying Disturbed Area Phase 1 <br />3.66 <br />ac <br />$ 200 <br />$ 732 <br />Topsoil Placement Disturbed Area Phase 1 <br />3.66 <br />ac <br />$ 1,800 <br />$ 6,588 <br />Revegetate Disturbed Area Phase 1 <br />3.66 <br />ac <br />$ 1,000 <br />$ 3,660 <br />Mobilization <br />1.0 <br />Is <br />$ 2,500 <br />$ 2,500 <br />1,000 <br />$ <br />2,150 <br />Total Direct Cost $ <br />13,480 <br />Overhead and Profit Cost (12.60 %) $ 1,698 <br />Contract Cost $ 15,178 <br />Project Management (9.25 %) $ 1,404 <br />Total Required Financial Warranty For Phase 1 $ 16,582 <br />Phase 11A (2.15 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit <br />Cost <br />Cost <br />Cost <br />Scarifying Disturbed Area Phase 11A <br />2.15 <br />ac <br />$ <br />200 <br />$ <br />430 <br />Topsoil Placement Disturbed Area Phase 11A <br />2.15 <br />ac <br />$ <br />1,800 <br />$ <br />3,870 <br />Revegetate Disturbed Area Phase 11A <br />2.15 <br />ac <br />$ <br />1,000 <br />$ <br />2,150 <br />Mobilization <br />1.0 <br />Is <br />$ <br />2,500 <br />$ <br />2,500 <br />$ 1,474 <br />Topsoil Placement Disturbed Area Phase 2 <br />7.37 <br />Total Direct Cost $ <br />8,950 <br />Overhead and Profit Cost (12.60 %) $ 1,128 <br />Contract Cost $ 10,078 <br />Project Management (9.25 %) $ 932 <br />Additional Financial Warranty Required For Phase 11A $ 11,010 <br />Cummulative Financial Warranty Required For Phase 1 & 11A $ 27,592 <br />Phase 2 (7.35 acres) <br />lReclamation Operation <br />Quantity <br />Unit <br />Unit <br />Cost <br />Cost <br />Backfill Required to Fill Phase 2 to 2 ft Above Groundwater (Haul <br />from Phases 1, 11 A) <br />65,000 <br />cyd <br />$ <br />2.50 <br />$ 162,500 <br />Backfill Required to Fill Phase 2 to 2 ft Above Groundwater <br />(OB from Phase 2) <br />40,000 <br />cyd <br />$ <br />1.50 <br />$ 60,000 <br />Scarifying Disturbed Area Phase 2 <br />7.37 <br />ac <br />$ <br />200 <br />$ 1,474 <br />Topsoil Placement Disturbed Area Phase 2 <br />7.37 <br />ac <br />$ <br />1,800 <br />$ 13,266 <br />Revegetate Disturbed Area Phase 2 <br />7.37 <br />ac <br />$ <br />1,000 <br />$ 7,370 <br />Mobilization <br />1.0 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost $ <br />247,110 <br />Overhead and Profit Cost (12.60°/x) $ 31,136 <br />Contract Cost $ 278,246 <br />Project Management (9.25 %) $ 25,738 <br />Additional Financial Warranty Required For Phase 2 $ 303 984 <br />Cummulative Financial Warranty Required For Phase 1, 11A, 2 $ 331,576 <br />2of6 <br />