My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-24_REVISION - M2008080 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2015-03-24_REVISION - M2008080 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:54 PM
Creation date
3/25/2015 8:52:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
REVISION
Doc Date
3/24/2015
Doc Name
Request TR01
From
JT
To
DRMS
Type & Sequence
TR1
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Inc. Journey ventures, LLC <br />J &T Consulting , <br />Journey Ventures Pit <br />3/192015' <br />FReclamation Bond Quantit ies and Costs tpyrtcyonsultinm Ina <br />Summary of Unit Costs <br />Direct costs <br />Re- applying topsoil 12 thick <br />$1,800.00 <br />/ acre <br />Revegetating disturbed area <br />$1,000.00 <br />/ acre <br />Dewatering full pit <br />$400.00 <br />/ million gallons <br />Slurry Wall Cost (75 foot average depth) <br />$310.00 <br />/ linear foot <br />( OS OR@ $31ft- 51- 70R @$411t- 71- 75R @$I&W) <br />$0.25 <br />/ cubic yard <br />Scarifying Ground <br />$200 <br />/ acre <br />Mobilization <br />$2,500 <br />lump sum <br />Overburden Placement <br />Hauling and placement of overburden <br />$0.50 <br />/ cubic yard <br />Blending and moisture conditioning <br />$0.50 <br />/ cubic yard <br />Compaction to desired density <br />$1.00 <br />/cubic yard <br />QA/QC <br />$0.25 <br />/ cubic yard <br />Total Overburden Placement Cost <br />$2.25 <br />/ cubic yard <br />Overhead and Profit Costs <br />Liability insurance <br />1.55% <br />of direct cost <br />Performance bond <br />1.05% <br />of direct cost <br />Profit <br />10.00% <br />of direct cost <br />Total Overhead Cost <br />12.60% <br />of direct cost <br />Project Management <br />Engineering and bidding <br />4.25% <br />of direct cost <br />Management and administration <br />5.00% <br />of direct cost <br />Total Additional Cost <br />9.25% <br />of direct cost <br />1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.