Laserfiche WebLink
March 19, 2015 C- 1982- 056/Foidel Creek Mine JLE <br />Debris in ditch leading to Pond T Metal tube in drainage above pond T. <br />HYDROLOGIC BALANCE -Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Ponds T, B, C, D, E, F, G, 6MN, 18LT, 6MN Sediment Ponds, the Fish Creek Borehole <br />ponds, and Area I Pit ponds were observed. Ponds E, D, F and G were discharging at the time of the inspection. <br />There was pooled water at the base of the Pond E embankment; this water is likely a result of snowmelt as there <br />seems to be a small low point at the base of this embankment. TC should monitor this area to see if the water <br />persists after spring run -off and snow melt has ended. If so, there could be water seeping from the pond. A new <br />flume has been installed at the discharge point for Pond B. The upper sump cell of Pond B was dredges last fall <br />according to Brian Watterson. <br />Water at the base of Pond E <br />Water at the base of Pond E <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 10 <br />t. <br />Water at the base of Pond E <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 10 <br />