Laserfiche WebLink
12 <br />Power line to West Portal <br />Post -law facilities <br />Power line extension RDA temporary substation (950') <br />Acid tank <br />Breaker Building with rock box <br />Power line extension to cell repeater (550') <br />Clean coal reclaim conveyor belt <br />Clean coal conveyor <br />Sewage package treatment building <br />Conveyor drive (east portal) <br />Clean coal stockpile <br />Water line from dewater pumps to pond 001 <br />Coal storage silos (2) <br />Fuel tank containment sumps (2) <br />Water pipe vaults (7) <br />Hoist house, sheave <br />East Portal air shaft with fan <br />Map 11 New Elk Mine Site Plan, East Portal, Sheet 3 — Facilities <br />Post -law facilities <br />Pre -law facilities <br />Acid tank <br />Breaker Building with rock box <br />Anti freeze tank sump <br />Clean coal reclaim conveyor belt <br />Clean coal conveyor <br />Clean coal reclaim tunnel <br />Conveyor drive (east portal) <br />Clean coal stockpile <br />Emergency escape hoist <br />Coal storage silos (2) <br />Fuel tank containment sumps (2) <br />Compressor building with pressure vessel <br />Hoist house, sheave <br />East Portal air shaft with fan <br />Mine dewatering pumps(2) <br />Mine rescue practice field <br />Raw coal conveyor belt <br />Non -coal storage area (equipment /supply storage) <br />Raw coal reclaim tunnel <br />Oil House <br />Refuse conveyor belt <br />Raw coal stockpile areas #1 and #2 <br />Refuse disposal area <br />River crossing footbridge #1 <br />Silo load out belt <br />Rock dust storage <br />Stacking tubes (2) <br />Scale (wash -down facility) <br />Subsoil storage stockpile <br />Shop building (industrial) <br />Thickener pump house <br />Slope structure <br />Thickener tank <br />Topsoil stockpile areas <br />Prep plant <br />Transfer building <br />Portable truck scales <br />Transfer conveyor belt <br />Bates portal conveyor drive <br />Walkway tunnel <br />Bates portal belts, 1, 2, and 3 <br />Bates portal transfer tower <br />Refuse belt extension — northeast <br />C & W train shop <br />10 stall garage <br />C & W trains sands loading building <br />Car department office <br />Fire hose building <br />Small propane tank <br />Refuse conveyor extension (200 Ft rigid) <br />Two 150 Ft long radial stackers at RDA <br />Refuse belt conveyor — 500 Ft portable <br />DWDA #2 belt feeder <br />DWDA #2 transfer belt 500 Ft portable <br />DWDA #2 elevating belt 100 Ft <br />Truck loading system near silos <br />Section 2.05 TR -70 03/02/2015 <br />