Laserfiche WebLink
13 <br />Table 19 (cont.) <br />Map 11 New Elk Mine Site Plan, East Portal, Sheet 3 — Facilities <br />Phase I released <br />Removed from site <br />Permanent <br />Warehouse #2 <br />Development coal waste pile <br />Garage <br />Cap house <br />Electrical house <br />Coal lab <br />Load out belt building <br />River crossing culvert <br />Topsoil borrow area <br />Rail car and refuse belt deicer <br />River crossing foot bridge <br />Raw coal stockpile #3 and #4 <br />Hoist house <br />Refuse disposal slurry <br />DWDA #3 <br />Sparge/VES remediation system <br />Access road to DWDA #3 <br />topsoil pile <br />Transfer to load out belt <br />Pump house <br />Truck dump <br />Warehouse #1 w/ <br />walkway tunnel <br />Truck dump conveyor <br />Light use roads for <br />geotech holes <br />Warehouse #3 pad <br />Map 12 Surface Facilities and Roads — West Portal <br />Post -law facilities <br />Pre -law facilities <br />Removed from site <br />Permanent <br />Bio- remediation storage <br />site <br />Fan Shaft <br />Cap house <br />West Mine access /haul <br />road <br />Non -coal disposal area <br />Core house <br />West containment #2 <br />Topsoil borrow area <br />Garage /oil house <br />West portal fan <br />Hoist house <br />DWDA #3 <br />Powder house <br />Access road to DWDA #3 <br />topsoil pile <br />Pump house <br />Light use road to slurry <br />wells S2 & S3 <br />Warehouse #1 w/ <br />walkway tunnel <br />Light use roads for <br />geotech holes <br />Power lines from east <br />portal <br />Power substation <br />Haul road to DWDA #3 <br />Light use road to <br />catchment #2 <br />Light use road to soil <br />storage area for DWDA <br />#3 <br />Post -law facilities are those permitted or constructed after August 3, 1977 <br />Pre -law facilities are those constructed prior to August 3, 1977 <br />Section 2.05 TR -70 03/02/2015 <br />