My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-09_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2015-03-09_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:08 PM
Creation date
3/24/2015 2:28:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/9/2015
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Table 19 Surface Facilities List <br />Map 3C New Elk Mine Slope Bottom Area — Apache Seam <br />Post -law facilities <br />Apache Canyon air shaft #1 <br />Apache Canvon air shaft #2 <br />Map 13 Sediment and Surface Water Control Plan East Portal <br />Post -law facilities <br />Ditches <br />Culverts <br />Ponds, embankments, outlet works <br />Map 14 Sediment and Surface Water Control Plan —West Portal <br />Post -law facilities <br />Pre -law facilities <br />Ditches <br />Slope Track <br />Culverts <br />Load out substation <br />Ponds, embankments, outlet works <br />Map 11 New Elk Mine Site Plan, East Portal, Sheet 1— Roads, Slope Track, Cut Areas <br />Post -law facilities <br />Pre -law facilities <br />Removed from site <br />Slope Track <br />Roads <br />Load out substation <br />Access road (Bates Portal) <br />Light Use Road (Bates Portal) <br />Light Use roads (RDA expansion area) <br />Light Use road to cell repeater <br />Map 11 New Elk Mine Site Plan, East Portal, Sheet 2 — Utilities <br />Post -law facilities <br />Pre -law facilities <br />Removed from site <br />25,000 gal water tank <br />Water pumphouse tanks <br />Load out substation <br />400,000 gallon water tank <br />65,000 gallon water tank <br />Central pumping station (pumps to water tanks) <br />East Portal substation <br />Prep Plant substation <br />Refuse substation & conc. Slab (temporary) <br />Refuse substation <br />Power line to dewatering pumps(3) <br />Power line to load out substation <br />Power line to Prep Plant substation <br />Power line to RDA substation <br />Section 2.05 TR -70 03/02/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.