My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-23_PERMIT FILE - M2015008 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015008
>
2015-03-23_PERMIT FILE - M2015008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:37 PM
Creation date
3/24/2015 12:20:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015008
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2015
Doc Name
Revisions Application
From
Kirkland Construction
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5.5: EROSION CONTROL <br />Materials <br />Installation <br />Maintenance <br />and Inspection <br />EC 8: BERWDIVERSION <br />• Berms and diversions should be constructed of compacted soil or coarse <br />aggregate. <br />• All berms shall have an uninterrupted positive grade to a stabilized <br />outlet. The outlet should be capable of conveying concentrated runoff <br />into an undisturbed, stabilized area at a non - erosive velocity. <br />• Berms shall be compacted as needed to prevent unequal settlement. <br />• Diversion channels shall be excavated or shaped to line, grade, and cross - <br />section as indicated in the plans and as required to meet the criteria as <br />specified. <br />• All trees, brush, stumps, obstructions, and other objectionable material <br />shall be removed and disposed of so as not to interfere with the proper <br />functioning of the diversion. <br />• Berms and diversion channels should be stabilized with riprap, turf <br />reinforcement or appropriate measure for protection against erosion and <br />failure. <br />• Inspection and maintenance must be provided periodically and after each <br />rain or snowfall event that causes runoff. <br />• Sediments accumulated against the berm should be removed periodically <br />and properly disposed of. <br />• Erosion along the berm should be repaired with the stabilization measure <br />re- established. <br />5-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.