Laserfiche WebLink
SECTION 5.5: EROSION CONTROL <br />BERM <br />EC 8: BERMIDIVERSION <br />COMPACTED SOIL <br />(OR COARSE AGGREGATE) <br />11 n 4 2 � \ 1.-- -FLOW <br />4.5- MIN <br />DIVERSIONS. <br />10% SETTLEMENT <br />6" FREE BOARD <br />DESIGN FLOW <br />DEPTH • <br />TRAPEZOIDAL DIVERSION <br />10% SETTLEMENT <br />6' FREE BOARD <br />• DESIGN FLOW <br />DEPTH <br />V—SHAPED DIVERSION <br />FIGURE EC 8.1 <br />Berm/Diversion Geometry (Adapted from VEaSCH28) <br />5-27 <br />