2015-03-23_PERMIT FILE - M2015008 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015008
>
2015-03-23_PERMIT FILE - M2015008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:37 PM
Creation date
3/24/2015 12:20:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015008
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2015
Doc Name
Revisions Application
From
Kirkland Construction
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. The area mined will be an approximate 15' -30' in depth. <br />E. A portable crusher will be used to produce aggregate for the <br />CDOT project on Highway 9, the location of the plant is indicated <br />on Exhibit E, mining plan. <br />F. An Asphaltic Concrete Batch Plant and Ready Mix Concrete Batch <br />Plant will be located on the mine site in conjunction with the <br />highway project. The location of the plants is indicated on Exhibit <br />E, Mining Plan. These plants are permitted under the County's <br />Special Use Permit. <br />G. Excavated pit area for mining will be an approximate 30 acres. <br />Please refer to Exhibit C. <br />H. An access road entrance as shown on Exhibit A. <br />I. Fuel and oil products will be stored on the site. A Spill Prevention, <br />Control, and Countermeasure plan is included in MH4 of our <br />Storm Water Pollution Prevention Plan ( SWPPP) that is included <br />as part of our Colorado Discharge Permit. As required by our <br />County Special Use Permit, all secondary storage is 150% of the <br />material being stored. Our SWPPP is included in its entirety for <br />convenience. <br />J. Equipment Servicing will be done onsite, all servicing vehicles will <br />be equipped with spill kits to facilitate immediate containment of <br />any accidental spills. All spills will be cleaned up immediately in <br />accordance with our SPCC Plan. <br />K. Approximately 12,000 gallons of water per day will be hauled in to <br />the pit from the Town of Kremmling. Water will be stored in an <br />HDPE lined construction water pond. The pond location is <br />indicated on Exhibit E. <br />