Laserfiche WebLink
L. It is not anticipated that ground water will be encountered. Please <br />see the attached Storm Water Prevention Plan for BMP locations. <br />All mining activity will remain two feet above any static <br />groundwater elevation that may be encountered unexpectedly. <br />M.It is not anticipate any refuse, acidic or toxic material will be <br />encountered. However if anything would be exposed mining <br />would cease in the area and the offensive material would be <br />disposed of properly per local, state, and federal regulations. <br />N. Slopes of 3:1 or flatter will be constructed to control erosion. <br />Perimeter Slopes are anticipated to be mined at the 3H:1V slope <br />ratio. <br />O. Material will be crushed to provide aggregate for base course, <br />concrete, embankment material, backfill /bedding and asphalt. <br />P. Base course, Concrete aggregates, embankment material, <br />backfil[ /bedding material and asphalt aggregates. <br />Q. There will be no incidental products at this operation. <br />R. No explosives are anticipated. <br />