shorten the mine life. Due to other factors regrading demand in the area and
<br />supply reductions from other pits, the following mining and reclamation timetable
<br />is forecast as shown in the revised Table D -1:
<br />Table D -1 Mining Area Material Table
<br />Mining Area
<br />Acreage
<br />Topsoil (C.Y.)
<br />Overburden (C.Y.)
<br />Gravel (tons)
<br />Facilities Area
<br />8.48
<br />13,681
<br />13,681
<br />540,744
<br />Mining Phase 1
<br />13.84
<br />22,329
<br />22,329
<br />882,535
<br />Mining Phase 2
<br />17.13
<br />27,636
<br />27,636
<br />1,092,329
<br />Mining Phase 3
<br />14.05
<br />22,667
<br />22,667
<br />895,926
<br />Mining Phase 4
<br />19.15
<br />30,895
<br />30,895
<br />1,221,138
<br />Mining Phase 5
<br />11.82
<br />19,070
<br />19,070
<br />753,726
<br />Mining Phase 6
<br />15.29
<br />24,668
<br />24,668
<br />974,997
<br />Mining Phase 7
<br />16.44
<br />26,523
<br />26,523
<br />1,048,329
<br />Mining Phase 8
<br />17.12
<br />27,620
<br />27,620
<br />1,091,691
<br />Mining Phase 9
<br />15.56
<br />25,103
<br />25,103
<br />992,215
<br />Mining Phase 10
<br />13.52
<br />21,812
<br />21,812
<br />862,130
<br />Mining Phase 11
<br />8.72
<br />14,068
<br />14,068
<br />556,048
<br />0.00
<br />O
<br />0
<br />O
<br />Total
<br />171.12
<br />276,074 1
<br />276,074
<br />10,911,809
<br />Avg Gravel Thickness Ft I Yrs to Mine I
<br />26.35
<br />2.70
<br />26.35
<br />4.41,
<br />26.35
<br />26.35
<br />4.48
<br />26.35 -
<br />6.11
<br />26.35
<br />3.77,
<br />26.35
<br />4.874
<br />26.35
<br />5.24'
<br />26.35
<br />5.46
<br />26.35
<br />--
<br />26.35
<br />---4.96-i
<br />4.31;
<br />- 26.35
<br />2.78 ,
<br />The Years to mine the deposit has been reduced to 54.56 years, based on the forecast
<br />sales rate of 200,000 tons per year and the leaving of the berm in place. Phases 1 -11 are
<br />shown as the mining sequence on Map C -2. All other aspects of the mine plan and
<br />reclamation plan have not changed.
<br />Changes 2 and 3 will result in reductions to the permit area from 253.23 acres to 244.25
<br />acres, therefore, new Mine Plan, Reclamation Plan and Cross Section Maps have been
<br />provided in the Technical Revision. These are Maps C -2, C -3 and F. No new lands are
<br />added for this revision and there is no change to the post -mine land use.
<br />The Pit Mining Sequence is shown on the revised Table D -2 on the following page.
<br />0.00
<br />54.56;
<br />
|