Laserfiche WebLink
shorten the mine life. Due to other factors regrading demand in the area and <br />supply reductions from other pits, the following mining and reclamation timetable <br />is forecast as shown in the revised Table D -1: <br />Table D -1 Mining Area Material Table <br />Mining Area <br />Acreage <br />Topsoil (C.Y.) <br />Overburden (C.Y.) <br />Gravel (tons) <br />Facilities Area <br />8.48 <br />13,681 <br />13,681 <br />540,744 <br />Mining Phase 1 <br />13.84 <br />22,329 <br />22,329 <br />882,535 <br />Mining Phase 2 <br />17.13 <br />27,636 <br />27,636 <br />1,092,329 <br />Mining Phase 3 <br />14.05 <br />22,667 <br />22,667 <br />895,926 <br />Mining Phase 4 <br />19.15 <br />30,895 <br />30,895 <br />1,221,138 <br />Mining Phase 5 <br />11.82 <br />19,070 <br />19,070 <br />753,726 <br />Mining Phase 6 <br />15.29 <br />24,668 <br />24,668 <br />974,997 <br />Mining Phase 7 <br />16.44 <br />26,523 <br />26,523 <br />1,048,329 <br />Mining Phase 8 <br />17.12 <br />27,620 <br />27,620 <br />1,091,691 <br />Mining Phase 9 <br />15.56 <br />25,103 <br />25,103 <br />992,215 <br />Mining Phase 10 <br />13.52 <br />21,812 <br />21,812 <br />862,130 <br />Mining Phase 11 <br />8.72 <br />14,068 <br />14,068 <br />556,048 <br />0.00 <br />O <br />0 <br />O <br />Total <br />171.12 <br />276,074 1 <br />276,074 <br />10,911,809 <br />Avg Gravel Thickness Ft I Yrs to Mine I <br />26.35 <br />2.70 <br />26.35 <br />4.41, <br />26.35 <br />26.35 <br />4.48 <br />26.35 - <br />6.11 <br />26.35 <br />3.77, <br />26.35 <br />4.874 <br />26.35 <br />5.24' <br />26.35 <br />5.46 <br />26.35 <br />-- <br />26.35 <br />---4.96-i <br />4.31; <br />- 26.35 <br />2.78 , <br />The Years to mine the deposit has been reduced to 54.56 years, based on the forecast <br />sales rate of 200,000 tons per year and the leaving of the berm in place. Phases 1 -11 are <br />shown as the mining sequence on Map C -2. All other aspects of the mine plan and <br />reclamation plan have not changed. <br />Changes 2 and 3 will result in reductions to the permit area from 253.23 acres to 244.25 <br />acres, therefore, new Mine Plan, Reclamation Plan and Cross Section Maps have been <br />provided in the Technical Revision. These are Maps C -2, C -3 and F. No new lands are <br />added for this revision and there is no change to the post -mine land use. <br />The Pit Mining Sequence is shown on the revised Table D -2 on the following page. <br />0.00 <br />54.56; <br />