My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-20_REVISION - M2013007 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2013007
>
2015-03-20_REVISION - M2013007 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:07 PM
Creation date
3/23/2015 9:24:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013007
IBM Index Class Name
REVISION
Doc Date
3/20/2015
Doc Name
Request TR02
From
Greg Lewicki and Associates, PPLC
To
DRMS
Type & Sequence
TR2
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D -2 Uncompahgre Pit Mining Sequence <br />Raw <br />Year <br />production <br />Phase <br />Comments <br />Length of time to <br />per year <br />complete (years) <br />tons <br />Phase 1 <br />Stripping and <br />Site Preparation, Construct Ponds, Topsoil stripping, <br />2015 <br />None <br />Facilities <br />build stockpile along southern permit boundary. <br />0.25 <br />Area <br />Mine Phase <br />Begin mining in PaCIlItICS Area. Hnng in facilities a er <br />2015 -2022 <br />208,000 <br />1 and <br />soil and OB stripping. Stockpile topsoil. Seed the <br />7.1 <br />stockpile. Place overburden on the pit floor. Mine Phase <br />facilities area <br />2022 -2027 <br />208,000 <br />Phase 2 <br />Mine Phase 2 and place topsoil and overburden on Phase <br />5.5 <br />Mining <br />1 regraded area. <br />2027 -2031 <br />208,000 <br />Phase 3 <br />Mine Phase 3 and place topsoil and overburden on Phase <br />4.5 <br />Mining <br />3 regraded area. <br />2031 -2037 <br />208,000 <br />Phase 4 <br />Mine Phase 4 and place topsoil and overburden on Phase <br />6.1 <br />Mining <br />3 regraded area. <br />2037 -2041 <br />208,000 <br />Phase 5 <br />Mine Phase 5 and place topsoil and overburden on Phase <br />3.8 <br />Mining <br />4 regraded area. <br />2041 -2045 <br />208,000 <br />Phase 6 <br />Mine Phase 6 and place topsoil and overburden on Phase <br />4.8 <br />Mining <br />5 regraded area. <br />2045 -2051 <br />208,000 <br />Phase 7 <br />Mine Phase 7 and place topsoil and overburden on Phase <br />5.2 <br />Mining <br />6 regraded area. <br />2051 -2056 <br />208,000 <br />Phase 8 <br />Mine Phase 8 and place topsoil and overburden on Phase <br />5.4 <br />Mining <br />7 regraded area. <br />2056 -2061 <br />208,000 <br />Phase 9 <br />Mine Phase 9 and place topsoil and overburden on Phase <br />5.0 <br />Mining <br />8 regraded area. <br />2061 -2065 <br />208,000 <br />Phase 10 <br />Mine Phase 10 and place topsoil and overburden on <br />4.3 <br />Mining <br />Phase 9 regraded area. <br />2065 -2068 <br />208,000 <br />Phase 11 <br />Mine Phase 11 and place topsoil and overburden on <br />2.8 <br />Mining <br />Phase 10 regraded area. <br />Remove scale and mobile equipment. Place stockpiled <br />2068 <br />Final <br />topsoil on the pit floor and sideslopes of Mining Phase <br />0.3 <br />Reclamation <br />11 and the pit floor of the existing pit area. Seed and <br />mulch topsoiled area. <br />Total <br />54.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.