Laserfiche WebLink
Table E -2 — Reclamation Timetable below. This schedule is dependent on the rate of mining, <br />which will fluctuate with market demands. The operator will reclaim each phase once it is <br />complete, and as mining is conducted in the following phase. <br />Cerise Mine March 2015 E -3 <br />