Laserfiche WebLink
Table E -2 — Reclamation Timetable <br />Description <br />Time Required <br />Build topsoil berm and overburden stockpile. Revegtate berm and pile <br />immediately upon completion. Mine out Phase I and 1B. <br />1.7 <br />Mine out Phase 1C phase after backfilling Phase IA. Topsoil and <br />revegetate Phase IA. <br />3.4 <br />Reclaim most of Phase 1B and some of Phase 1C while mining Phase 2. <br />5.9 <br />Reclaim Phase 2 while mining Phase 3. <br />4.7 <br />Reclaim Phase 3 while mining Phase 4. <br />2.2 <br />Reclaim remaining disturbed areas such as berms and the scale area. <br />0.3 <br />7.5 <br />18.2 <br />5. Revegetation Plan <br />The final revegetation plan at the Cerise Mine is unchanged from the currently approved one. It <br />will leave a post mine land use of upland meadow and grazing land. The seed mixes are as <br />follows: <br />Table E- 3 - Native Seed Mix for Upland Areas <br />Common Name <br />Scientific Name <br />Variety <br />% of <br />Mix <br />PLSI <br />Application <br />Rate lbs /ac <br />Western Wheat ass <br />Pasco rum smithii <br />25 <br />7.5 <br />Slender Wheat grass <br />El mus trach caulus <br />1 25 <br />7.5 <br />Bluebunch Wheat grass <br />Pseudoregneria s icata <br />secar <br />10 <br />3 <br />Green Needle grass <br />Nassella viridula <br />15 <br />4.5 <br />Blue Grama <br />Bouteloua gracilis <br />15 <br />4.5 <br />Indian Rice grass <br />Achnatherum h menoides <br />10 <br />3 <br />Total lbs /ac <br />100% <br />30 <br />Cerise Mine March 2015 E -4 <br />