My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-18_REVISION - M1994114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994114
>
2015-03-18_REVISION - M1994114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:25 PM
Creation date
3/19/2015 9:19:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
REVISION
Doc Date
3/18/2015
Doc Name
Second Adequacy Review CN01
From
DRMS
To
Any Kagan, Ken Klco
Type & Sequence
CN1
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim Kagan and Son South Pit <br />Site: Kagan & Son South Pit Permit Action: CNO1 <br />PROJECT IDENTIFICATION <br />Task #: 999 State: Colorado <br />Date: 3/17/2015 County: Custer <br />User: TOD <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: M1994114 <br />Abbreviation: None <br />Filename: M114-999 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Spread 12 inches of topsoil over 10 acres <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />46.60 <br />$9,734.00 <br />$3,231.00 <br />$10,228.00 <br />$4,680.00 <br />Rip 10 acres and Rip the Road <br />RIPPER <br />14.50 <br />Revegetation of 10 acres <br />REVEGE <br />40.00 <br />Mobilization and Demobilization <br />MOBILIZE7 <br />8.65 <br />SUBTOTALS: <br />109.75 <br />$27,873 <br />INDIRECT COSTS <br />C.]r /213WoI911%W.W163a1,01aIa <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$563.03 <br />1.05% <br />Total = <br />$292.67 <br />40.00 hrs <br />Total = <br />$3,006.40 <br />10.00% <br />Total = <br />$2,787.30 <br />TOTAL O & P = <br />$6,649.40 <br />CONTRACT AMOUNT (direct + O & P) = <br />$34,522.40 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />0.00% <br />5.00% <br />Total = 0.00 <br />Total = $0.00 <br />$1,726.12 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $8,375.52 <br />TOTAL BOND AMOUNT (direct + indirect) = $36,248.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.