My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-18_REVISION - M1994114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994114
>
2015-03-18_REVISION - M1994114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:25 PM
Creation date
3/19/2015 9:19:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
REVISION
Doc Date
3/18/2015
Doc Name
Second Adequacy Review CN01
From
DRMS
To
Any Kagan, Ken Klco
Type & Sequence
CN1
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 001 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Spread 12 inches of topsoil over 10 acres <br />Site: Kagan & Son South Pit Permit Action: CNO1 Permit/Job #: M1994114 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/17/2015 County: Custer <br />User: TOD <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D8T - 8U <br />310 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: M 114 -001 <br />Total unit Cost/Hour: $208.90 <br />Total Fleet Cost/Hour: $208.90 <br />MATERIAL QUANTITIES <br />(AB.AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$62.67 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $208.90 <br />Total Fleet Cost/Hour: $208.90 <br />MATERIAL QUANTITIES <br />(AB.AVG.) <br />Initial Volume: <br />16,133 <br />Swell factor: <br />1.000 <br />Loose volume: <br />16,133 LCY <br />Source of estimated volume: DRMS estimate and CNO1 Exhibit E <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />275 feet <br />348.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -5% <br />Average site altitude: 8,300 feet <br />Material weight: 2,100 lbs/LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Source <br />0.900 <br />(AB.AVG.) <br />1.100 <br />(CAT HB) <br />1.100 <br />50% SL) <br />1.000 <br />(AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.